Monday, 19 February 2018

Implementation of mock up 1./ The assembly of House 1!



It took only a working day to assemble the three sections needed to set up the structure for the house and some extra hands to erect the structure! Later, a simple “façade mounting technique” was used to close three sides. The Mock up was installed in the BAMP! Workshop, where it is still standing today! Follow this link to watch the building process!

 https://www.youtube.com/watch?v=Atqq8jbB45k